E-MAIL FOR SPONSORSHIP

GUVNL Floats Tender to Procure 500 MW Wind-Solar Hybrid Power

The last date for the submission of bids is March 13, 2024

thumbnail

Follow Mercom India on WhatsApp for exclusive updates on clean energy news and insights


The Gujarat Urja Vikas Nigam (GUVNL) has invited bids for the purchase of power from 500 MW grid-connected wind-solar hybrid renewable energy projects with the possibility of expanding the capacity by an additional 500 MW through the greenshoe option.

⭐ This is a premium article. Subscribe to access exclusive content.

Subscribe to Continue Reading

Get unlimited access to premium articles, in-depth analysis, and exclusive content from Mercom India.

Unlimited premium article access
Exclusive market insights
Premium research reports
Ad-free reading experience
Loading subscription plans...

RELATED POSTS

Get the most relevant India solar and clean energy news.

RECENT POSTS